Keystone’s client proposed to install approximately 7,500 linear feet of 12” steel natural gas pipeline to transport natural gas between two well sites. Wetlands associated with naturally producing trout streams in the areas were considered Exceptional Value. Keystone’s environmental scientists were able to find a route that avoided these sensitive resources, which in turn eliminated the need for a Joint Permit Application and greatly reduced the required review time with the regulatory agencies.
Keystone’s client proposed to install a permanent 425 foot by 350 foot gravel pad, with an attached 100...
Keystone’s client proposed to convert the previously permitted and constructed bio-retention area/rain...
Keystone has a team of civil engineers, construction representatives, and environmental scientists who work...
Keystone’s client proposed to install a construct a permanent 450 foot by 300 foot well pad in eastern...
Keystone’s client was proposing to install a 6 MG freshwater impoundment, gravel access road, and gravel...
Keystone’s environmental group regularly prepares permit documents for the submission of stream and wetland...