Engineering Project 5

Keystone’s client proposed to install a construct a permanent 450 foot by 300 foot well pad in eastern Ohio. Keystone provided a historic site inquiry, an environmental due diligence study, performed deed research, property survey, site feature and topographic survey, conceptual site planning, driver permitting, horizontal well site construction permitting, construction drawing preparation, construction certification, and natural gas well permitting.

Engineering 5