Keystone’s client proposed to install a construct a permanent 450 foot by 300 foot well pad in eastern Ohio. Keystone provided a historic site inquiry, an environmental due diligence study, performed deed research, property survey, site feature and topographic survey, conceptual site planning, driver permitting, horizontal well site construction permitting, construction drawing preparation, construction certification, and natural gas well permitting.
Keystone’s client proposed to install a permanent 425 foot by 350 foot gravel pad, with an attached 100...
Keystone’s client was proposing to install a 6 MG freshwater impoundment, gravel access road, and gravel...
Keystone’s client proposed to convert the previously permitted and constructed bio-retention area/rain...
Keystone has a team of civil engineers, construction representatives, and environmental scientists who work...
Keystone’s client proposed to install approximately 7,500 linear feet of 12” steel natural gas pipeline...
Keystone’s environmental group regularly prepares permit documents for the submission of stream and wetland...